SSRs and dumploads
Calculate how many SSRs and dumploads you need for your configuration:The total power of the dumpload must be at least 120% - 130% (safety margin, in case dump loads fail) of the total power of your system, if you don't have a water valve.
If you have a water valve, the total power of the dump loads should be at least double the size of your biggest expected user load. E.G. if you have a 10kW user load, your combined dumploads should be at least 20kW.
Electronic components
Make sure you can source all of the components, including the PCBOptions how to get the PCB
- Etch yourself - google for information, I am not an expert in this
- Send the Gerber rs-247x file and the drilling file to a pcb manufacturer.
I use http://www.pcb-devboards.de/catalog/index.php?language=en
- order from me, if you don't want the hassle of dealing with gerber files
Buy components
Solder everything together
Program chip - or get from me
Install at the hydro power site
Tune the PI controller
Future development: implement an Auto-Tuning function, so there will be no on-Site experiments necessary
other helpful docs:
http://www.atp.ruhr-uni-bochum.de/rt1/syscontrol/node64.html
ulf holmberg
That's it!
No comments:
Post a Comment